曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
TABLE OF CONTENTS
CHAPTER 13
Page
TABLE OF CONTENTS 13.00.1
DESCRIPTION
General 13.10.1
System 1 and 2 13.10.1
System 3 13.10.1
Emergency Hydraulic Power 13.10.1
Hydraulic Accumulators 13.10.1
Distribution Table Schematic 13.10.2
Hydraulic System Indication 13.10.3
Hydraulic Synoptic Page 13.10.3
Hydraulic Control Panel 13.10.3
Systems Overview Schematic 13.10.4
Hydraulic System 1 and 2 13.10.5
Engine Driven Pump 13.10.5
Aft Equipment Bay Components 13.10.5
Reservoir 13.10.5
AC-Motor Pumps (ACMPs) 13.10.6
Filter manifold 13.10.6
Hydraulic Shutoff Valve Control Panel 13.10.6
Hydraulic Shutoff Valves 13.10.7
Heat Exchanger 13.10.7
System 2 Accumulator 13.10.8
Ground Service Panel 13.10.8
Hydraulic Control Panel (1B/2B Switches) 13.10.9
Hydraulic 1B and 2B Pump Switches 13.10.9
Manual Mode 13.10.9
Auto Mode 13.10.9
Ground Operation Inhibits 13.10.9
Flight Operation 13.10.10
Hydraulic System 1 Schematic 13.10.11
Hydraulic System 2 Schematic 13.10.12
Hydraulic System 3 13.10.13
Reservoir 13.10.13
ACMPs 3A and 3B 13.10.13
Ram Air Turbine (RAT) 13.10.14
Heat Exchanger 13.10.14
Filter manifold 13.10.14
Ground Service Panel 13.10.14
Rev 3, Apr 25, 2005 Flight Crew Operating Manual Volume 2
CSP 700.5000.6 13.00.1
TABLE OF CONTENTS
Page
DESCRIPTION
RAT and System 3 Accumulators 13.10.15
Hydraulic Control Panel (3A/3B Switches) 13.10.16
Hydraulic 3A and 3B Pump Switches 13.10.16
AC-Motor Pumps 13.10.16
Manual Mode 13.10.16
Auto Mode 13.10.17
Ground Operation Inhibits 13.10.17
Flight Operation 13.10.17
Ram Air Turbine (RAT) 13.10.17
Hydraulic System 3 Schematic 13.10.18
RAT Deployment Hydraulic Schematic 13.10.19
ACMP Power and Distribution 13.10.20
ACMPs 1B and 2B 13.10.20
ACMPs 3A and 3B 13.10.20
ACMP Electrical Power Schematic 13.10.20
External and APU Electrical Pump Operation 13.10.20
Reservoir Quantity Limits 13.10.21
中国公务机网 www.gongwuji.com
公务机翻译 www.aviation.cn
本文链接地址:庞巴迪环球5000公务机机组操作手册 Bombardier Global-液压
|