返回首页

庞巴迪挑战者300公务机机组操作手册 Bombardier Challenger-防火(2)

时间:2011-11-12 06:09来源:蓝天飞行翻译 作者:公务机
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
  

Cargo Bay Fire Protection................................................................................................... 09-01-11
Description................................................................................................................. 09-01-11
Components and Operation.......................................................................................09-01-11
Smoke Detectors ....................................................................................................... 09-01-11

Controls and Indications......................................................................................................09-01-12
Systems Test..............................................................................................................09-01-12
Description.................................................................................................................09-01-12

EICAS Messages................................................................................................................09-01-13

May 06/2005 Flight Crew Operating Manual Volume 2 REV 2 CSP 100-6
09-00-01

INTRODUCTION
The fire protection system is divided into two subsystems: -Fire detection
-Fire extinguishing The fire detection system detects fire in the engines and APU and overheat detection in the main landing gear bays. The fire extinguishing system provides extinguishing capability for the engines and APU. The detection and extinguishing systems are tested and monitored from the flight deck.

CFO0901002_004
Sep 13/2004 Flight Crew Operating Manual Volume 2 REV 1 CSP 100-6
09-01-01 INTRODUCTION (Cont)
FIRE DETECTION SYSTEM — BLOCK DIAGRAM
ENGINE FIRE- DETECTION SYSTEM

APU FIRE- DETECTION SYSTEM FIRE- DETECTION-AND- EXTINGUISHING (FIREX) CONTROL UNIT ENGINE

INDICATION AND CREW ALERTING SYSTEM
(EICAS) AUDIO INTEGRATING

SYSTEM

MAIN LANDING GEAR (MLG) OVERHEAT-DETECTION SYSTEM

CFO0901002_007
Volume 2 Flight Crew Operating Manual May 06/2005 CSP 100-6 REV 2
09-01-02
FIRE PROTECTION SYSTEM OVERVIEW SCHEMATIC

1.  
ENGINE Panel.

2.  
Master WARNING/CAUTION LIGHTS.

3.  
Left MFD EICAS display.

4.  
FIREX Control Unit.

5.  
Left Main Wheel Well Overheat Detection.

6.  
Right Main Wheel Well Overheat Detection.

7.  
Fire Extinguisher Bottle No. 1.

8.  
Fire Extinguisher Bottle No. 2.

9.  
Left Engine Compartment Dis-charge Lines.

10.
Right Engine Compartment Dis-



ENG NE 
FIRE  FIRE 
FIRE EX 
GNI O  AU O NC  M CH HO 
R STAR R 
U O APR 

WARNING  WARNING 
CAUTION  CAUTION 
 
中国公务机网 www.gongwuji.com
公务机翻译 www.aviation.cn
本文链接地址:庞巴迪挑战者300公务机机组操作手册 Bombardier Challenger-防火(2)
 

------分隔线----------------------------