曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
Sep 13/2004 Flight Crew Operating Manual Volume 2 REV 1 CSP 100-6 02-04-03 PRESSURIZATION (Cont) PRESSURIZATION SCHEDULE — CLIMB AND CRUISE Aircraft Altitude (ft) Cabin Altitude (ft) Cabin Delta P (PSID) Aircraft Altitude (ft) Cabin Altitude (ft) Cabin Delta P (PSID) Aircraft Altitude (ft) Cabin Altitude (ft) Cabin Delta P (PSID) -1500 -1786 0.1 15 000 1379 5.8 33 000 4955 8.3 -1000 -1273 0.1 16 000 1504 6.0 34 000 5272 8.3 0 -245 0.1 17 000 1637 6.3 35 000 5612 8.3 1000 -135 0.6 18 000 1778 6.5 36 000 5877 8.3 1500 -81 0.8 19 000 1926 6.8 37 000 6076 8.4 2000 -26 1.0 20 000 2091 7.0 38 000 6331 8.5 3000 81 1.4 21 000 2258 7.2 39 000 6586 8.5 4000 187 1.9 22 000 2429 7.4 40 000 6827 8.5 5000 294 2.3 23 000 2608 7.6 41 000 7056 8.5 6000 399 2.7 24 000 2795 7.7 42 000 7272 8.5 7000 504 3.0 25 000 2984 7.7 43 000 7476 8.6 8000 610 3.4 26 000 3189 8.0 44 000 7669 8.7 9000 716 3.8 27 000 3404 8.2 45 000 7850 8.8 10 000 816 4.1 28 000 3628 8.3 - - - 11 000 925 4.4 29 000 3864 8.3 - - - 12 000 1036 4.8 30 000 4111 8.3 - - - 13 000 1150 5.1 31 000 4375 8.3 - - - 14 000 1268 5.4 32 000 4653 8.3 - - - PRESSURIZATION SCHEDULE — DESCENT AND HOLD (<25 000 FT) |