返回首页

庞巴迪CRJ200公务机机组操作手册 Bombardier CRJ-电源(9)

时间:2011-11-21 12:22来源:蓝天飞行翻译 作者:公务机
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
  
Warning System (EGPWS)  <0025>  CB Panel Integral Lights 
<0040> Flight Recorder Power  ARINC Display Fan, Galley and Cabin Fan  Inertial Reference System (1) <0025> 
Hydraulic System Fan  Flap Power Drive Unit (2)  Head-
up Guidance System 
Display Cooling Fan (R)  ADG Deploy Sensor  <0026> 
Exhaust and Cockpit Fan  TRU 2, DC Essential bus  Traffic Alert and Collision 
Flap Power Drive Unit (1)  Avoidance (TCAS) 
Engine Vibration Monitor  ARINC Chassis and Display 
ADG Deploy Sensor  Cooling Fans (L) 
TRU 1, DC essential bus  Essential TRU 1 

AC UTILITY BUS  AC UTILITY BUS  AC SERVICE  ADG Bus 
1  2  BUS 
Galley (1) and Coffee Maker Main Battery Chargerg Power Sensing Relay  Galley (2) and Water Systemy APU Battery Chargerg Power Sensing Relay  Service TRU Vacuum CleanerVacuum Cleaner Toilet Motor/pumpMotor/pump  Hydraulic Pump 3B Fla sFlap

Flight Crew Operating Manual  MASTER 
CSP A-
013 


 ELECTRICAL AC Electrical System  Vol. 1  07-
20-
12 
REV 56, Jan 31/03 

In the event of a complete ACpowerfailure in flight, the ADGwill automaticallydeploy andsupply115-
volts, 400Hz ACemergencypower totheADGbus. TheADG generatoris rated at15KVA. TheADGbuswillthen supply emergencypowertothe AC essentialbus andthe 3Bhydraulicpump. The ACessentialbus willthen power essentialTRU1, whichwillpower the DC essentialbus.
Iftheautomatic deployfunction fails, theADG can bedeployed manuallybypullingthe ADG manual release handle on theADGCONTROL controlpanelatthe rearofthe centerconsole.
Ifeithermain generatoris restored,the crewcan overridetheADGbypressingthe PWRTXFROVERRIDEbutton on theADG controlpanel. This willreconnectthe restoredIDGto power ACbus 1, ACbus 2andthe AC essentialbus. The ADGwill continue to power the criticalflight controls andthe ADGbus. The flaps willmove at half speed whenpoweredfrom theADGbus.
The ADGgenerator, voltage,frequencyandADGbusindications on theEICAS,AC ELECTRICAL synoptic page are onlydisplayed whentheADGbusis powered.
The ADGwill continue to operateand supplypowertotheADGbusuntilthe airspeed decreases belowapproximately100kts. Atthatpoint,iftheAPUgenerator orIDGhas notbeen restored,theonlypower available willbe from the batteries.
The ADG cannotbe restowedin flight. Itis restowed manually, on theground,by maintenance personnel.
NOTE
After ADG deployment or APU generator switching, intermittent failure of the pilot’s and copilot’s air data systems may occur. These failures may result in uncommandedchangestothepilot’sorcopilot’sflight instruments.Thebarometricaltimetersetting,altitude preselector,V-
speedsandspeedbugsettingsshould becheckedand reset as required.
 
中国公务机网 www.gongwuji.com
公务机翻译 www.aviation.cn
本文链接地址:庞巴迪CRJ200公务机机组操作手册 Bombardier CRJ-电源(9)
 

------分隔线----------------------------