返回首页

庞巴迪CRJ200公务机机组操作手册 Bombardier CRJ-环境控制系统(9)

时间:2011-11-22 09:08来源:蓝天飞行翻译 作者:公务机
曝光台 注意防骗 网曝天猫店富美金盛家居专营店坑蒙拐骗欺诈消费者
  
DISPLAY FAN STBY  AC ESS  3  C6 
EXHAUST FAN  AC BUS 1  1  C5 
ARINCARINC Chassis Fans  ARINC FAN 1  AC ESS  3  C12 
ARINC FAN 2  AC BUS 2  22  D2 
Controllerand Sh ff V lShutoff Valves  CONT2  DC BUS 2  L2 
CKPT SOV  L3 
I/B SOV  L4 
O/B SOV  DC BUS 1  1  L4 
AVIONICS CONT 1  DC ESS  4  C4 

Flight Crew Operating Manual  MASTER 
CSP A-
013 


 ENVIRONMENTAL CONTROL SYSTEM  Vol. 1  08-
40-

Aft Cargo Bay Ventilation System  REV 56, Jan 31/03 

1. CARGO COMPARTMENT AIR SYSTEM
The cargo compartment airsystem allows the flight crew tocontrolthe ventilation air within the cargo compartment. The systemconsists of arecirculation airshut-
off valve, recirculation fan andanexhaust air shut-
off valve. <0043><0059>
The cargo compartmentconditionedair systemallowsthe flight crew tocontrolthe ventilation airandtemperature within the cargo compartment. The systemconsists of a recirculation airshut-
off valve, recirculation fan,heaterand anexhaust airshut-
off valve. <0013><0034>
The systemis controlledby a2-
position CARGO,OFF/FAN switch ontheair-conditioning panel. In theOFFposition,both shut-
off valves are closedandthesystemisdisabled.In theFANposition, both shut-
off valves openandthefan is poweredtoblow recirculated cabin air intothe cargo compartmentto maintain thecompartmenttemperature above freezing. <0043><0059>
The systemiscontrolledby aCARGO,3-
position, OFF/FAN/AIRCONDswitch on the air-conditioningpanel. In theOFFposition,both shut-
off valves are closedandthesystem is disabled.IntheFANposition, both shut-
off valves openandthe recirculation fanis poweredtoblowrecirculated cabin air intothe cargo compartmentto maintain the compartmenttemperature above freezing. IntheCONDAIRposition, both shut-
off valves are open,theheateris enabled andthe recirculation fanis poweredtoblow heatedair into thecargo compartment. Theheateris controlledby atemperature control switchin the exhaustduct whichwillcyclethe heaterONandOFF as necessaryto maintain thecargo compartmenttemperature between 21bCand27bC(70bFand80bF). <0013><0034>
Anoverheat switchin theexhaustductprovides overtemperature protection by removing power totheheater when the exhaustducttemperature exceeds49bC(120bF). A signalis also senttotheEICAStodisplay aCARGOOVHT caution message. The switchwill reset whenthetemperature decreases below 29bC(85bF). <0013><0034>
Aduct overheat switchis installedin theheateroutlet. Iftheheaterdischargetemperature exceeds49bC(120bF)power is removedfrom theheater. The switchwill reset when the temperature decreases below 38bC(104bF). <0013><0034>
 
中国公务机网 www.gongwuji.com
公务机翻译 www.aviation.cn
本文链接地址:庞巴迪CRJ200公务机机组操作手册 Bombardier CRJ-环境控制系统(9)
 

------分隔线----------------------------